project name | ordos kangbashi sweat factory bar | project introduction | point to point display and unified broadcast control |
---|---|---|---|
project date | 2020.11 | equipment used | ls2 ls16 u3pro |
project location | erdos | project requirements | creative display |
view all cases
-
hubei enshi athena bar
project name:hubei enshi athena bar
project date:2020.01
project location:enshi
project introduction:
-
shenling ring, foshan, guangdong
project name:shenling ring, foshan, guangdong
project date:2022.04
project location:foshan, guangdong
project introduction:1. three trapezoidal modules; 2. load with sv8p g616c; 3. one box and one card
-
guangzhou wake up bar
project name:guangzhou wake up bar
project date:2021.08
project location:guangzhou city, guangdong province
project introduction:p4 screen of the bar, the ceiling and surrounding wall screen.
-
changshu zeus bar
project name:changshu zeus bar
project date:2021.04
project location:changshu city, jiangsu province
project introduction:there are four sky curtains and two long screens on the left and right sides.
-
club a miami
project name:club a miami
project date:2020.12
project location:tai'an city, shandong province
project introduction:1. one main screen, six auxiliary screens and one dj console on the front; 2. 12 rectangular sky curtains on the top; 3. 8 lantern shaped screens and 3 rear screens around
-
bijie bar
project name:bijie bar
project date:1970.01
project location:guizhou
project introduction:p4 multiple led screen
-
circular screen of industrial and commercial bank of china
project name:circular screen of industrial and commercial bank of china
project date:2021.03
project location:beijing
project introduction: special-shaped splicing
-
a bar in zunyi
project name:a bar in zunyi
project date:2020.07
project location:zunyi
project introduction:control all led screens with effects on the resolume software
-
riverside hotel
project name:riverside hotel
project date:2020.12
project location:ji'an city, jiangxi province
project introduction:1. one main screen and four auxiliary screens on the stage, and one ceiling screen on the top of the hall; 2. indoor p3, main screen 3840x1728, four side screens 896x1728 and sky curtain 4736x2816.