project name | shanghai baoshan hotel lobby | project introduction | thirty four rhombic screens are arranged in two rows, one with 17 rhombic screens |
---|---|---|---|
project date | 2021.08 | equipment used | s4*8、s2*2、g616c*272 |
project location | baoshan district, shanghai | project requirements | 1.one computer is centrally controlled, and 34 screens are combined into a whole picture |
view all cases
-
auspicious hyatt regency daqing, heilongjiang province
project name:auspicious hyatt regency daqing, heilongjiang province
project date:2020.07
project location:daqing
project introduction:p4, 12320*1520, 13 screens open at the same time, and switch and play
-
hangzhou 5g exhibition hall
project name:hangzhou 5g exhibition hall
project date:2020.01
project location:hangzhou
project introduction:the screen is a movable telescopic screen
-
beijing maker town
project name:beijing maker town
project date:2022.04
project location:beijing
project introduction:1. a large main screen on the front
-
hangzhou a unit exhibition hall
project name:hangzhou a unit exhibition hall
project date:2020.01
project location:hangzhou
project introduction:circular screen, using modeling and video to create 3d effect
-
chongqing chang'an immersive led display
project name:chongqing chang'an immersive led display
project date:2020.12
project location:chongqing
project introduction:5 screens, front can be opened or closed
-
hebei publishing media group
project name:hebei publishing media group
project date:2022.04
project location:shijiazhuang, hebei
project introduction:1. point spacing 1.53 module, left screen 5408*1872, main screen 14144*1560, floor tile screen 3226*1176, long screen 5504*334, right lcd 6*3. two sets of f2 are used for cascade control to realize the unified management of all screens.
-
haier group international exhibition hall
project name:haier group international exhibition hall
project date:2018.09
project location:shandong
project introduction:two servers have unified control over 20 screens to achieve complete point-to-point display. one plays 16 videos at the same time, while the other plays 9 videos at the same time.
-
sand table of xiangxi high tech zone
project name:sand table of xiangxi high tech zone
project date:2021.04
project location:xiangxi city, hunan province
project introduction:1. the whole screen is 8320 * 1024, and one sv16 is loaded
-
heilongjiang heihe huma tv studio
project name:heilongjiang heihe huma tv studio
project date:2021.03
project location:heilongjiang
project introduction:one main screen on the front and one ear screen on both sides.